It is understood that in the docking modification project, Chengxi Guangzhou carefully planned and cooperated with Guangzhou Guangchuan International Co., Ltd. Offshore Company and SBM Company to complete the established nodes of the docking stage of the project on time and in quality. Completed the replacement of the oil pipeline platform, the hull paint repair, the deck surface paint coating, and the right anchor chain protection device project. After the docking, the "Iliabella" will continue to complete the follow-up work. After a two-year repair and modification, it will be completed in the near future.
Integral Fin Tube,Integral Finned Tubing,Serrated Fins,Integral Low Fin Tube
Simcan Industrial Equipment Co.,Ltd. , https://www.simcanindustry.com