Welcome to our website  Jtp Mould is known as one of the best manufacturers and exporters for plastic injection moulds for household articles, chair mould, pallet mould, crate mould, automotive mould and so on. Our moulds are mainly exported to Philippines, Italy, Australia, Saudi Arabia,Jordan,Argentina,Colombia,India, Malaysia, Philippines and other 20 countries. JTP MOULD is also a high standard of pipe fitting moulds manufacturer. We can make PP, PVC, PPR fitting moulds, Tee mould, Elbow mould, union mould, socket mould etc.    1.More information about 2018 Pipe Fittings Mould     Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage6 3.our main business line 1) Household moulds: plastic chair, table, buckets, laundry basket, trash bin, kitchenware ,plastic sanitary ware mould, plastic container mould ,etc. 5) Packaging moulds: Blowing mould, pet bottle mould, Cap mould,etc. 6) Other mould: Syringe mould, Medical plastic mould, Other OEM mould  4.our advantages Professional plastic mould maker Exported to many countries Detailed production schedule Punctual delivery Good After-sale service 5.offers you Response on Email, telephone calls or fax in-time
Tower Crane Steel Structure, regarded as the main parts of tower crane, refers to the tower crane jib, tower crane counter jib, tower head, tower crane Telescoping Cage, tower crane turning table,tower crane pull rod, tower crane Mast Section, tower crane Fixing Angle, ect. Steel Structure is made of steel, which fits the name.
Tower crane jib is a metal lattice structure of a normally triangular section, whose main mission is to provide the crane with the necessary radius or range. It is also called a jib. Like the mast, it usually has a modular structure to facilitate its transport.
The Anchorage Frame secures the tower crane mast to a structure or framework and provides stability when the tower crane is under load or experiencing wind forces.
The hook is the main load-bearing component that hauls loads. It is attached to a trolley that allows the hook to raise and lower, as well as move towards and away from the mast.
Telescoping Cage Jacking Cage,Crane Telescoping Cage,Tower Crane Jacking Cage,Climbing Cage,Tower Crane Yoke SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sysuspendedplatform.com
Â
Professional technical system: collapsible core demoulding technology, unscrewing ejection technology, core sliding ejection technology, inserts over molding technology.
For quoting pipe fitting mould, Please just send us the list of the pipe fittings with standard size and product name.Â
2.Order Process For Mould From JTP mould
Â
2) Industrial moulds: pallet mould, crate mould, paint container mould ,plastic industrial part mould, plastic dustbin mould ,etc.
3) Thin wall moulds: thin wall cup, thin wall  tablewares, etc.
4) Pipe fitting moulds: PPR pipe fittings, PE,PVC pipe fittings.
Â
Â
Supply the quotation and mould designs in-time
Communication on the technical points in-time
Sending pictures for the mould machining progress and mould finishing Schedule in-time
Mould test and sample delivery in-time
2018 Pipe Fittings Mould
Design Software: UG
Standard: DME
Customized: Customized
Name: 2018 Pipe Fittings Mould
Cavity: 1 Cavity
Design: 3D or 2D
Runner Type: Cold Runner
Mould Steel: P20
Mould Base: Lkm.Hasco.Dme
Mould Life: 500.000shots
Sample Time: 45 Days
Material: PP, PVC, PPR
Style: Tee Mould, Elbow Mould, Union Mould, Socket Mould
Trademark: JTPmould
Transport Package: Wooden Case
Specification: SGS
Origin: Taizhou, Zhejiang, China
HS Code: 8480719090
name                 2018 Pipe Fittings Mould
mould material           P20Â
cavity                 1 cavity
Shaping Mode           Plastic Injection Mould
runner                 cold runner
mould design           3D/2D
design days            1 day
mould life              500,000 shots
plastic material         PP, PVC, PPR  etc.
injection system        fully automatic
steel hardness          36-52HRC(according to different steel)
payment              40% of deposit by L/C T/T 60% of balance by L/C T/T
delivery time           50 days
specification            depends on customers' demand